江苏少妇性BBB搡BBB爽爽爽,日本高清不卡二区三区,成年人免费在线观看视频网站,亚洲精品无码永久中文字幕

產(chǎn)品中心
PRODUCT CENTER

  • 聯(lián)系人 : 曹鏡森先生
  • 聯(lián)系電話 : 0769-82226193
  • 傳真 : 0769-82226193
  • 移動電話 : 15989458768
  • 地址 : ** 廣東省東莞市大朗鎮(zhèn)仙村仙一區(qū)99號
  • Email : caojingshen@126.com
  • 郵編 : 523792
  • 公司網(wǎng)址 : http://vfvalidation-europe.com
  • MSN : caoshingcer@126.com
  • QQ : 454992321
  • 聯(lián)系人 : 曹鏡森
  • 聯(lián)系電話 : 0769-82226193
  • 傳真 : 0769-82226193
  • 公司網(wǎng)址 : http://vfvalidation-europe.com/
文章詳情

Plastic factory dedicated central feeding system

日期:2025-04-03 05:21
瀏覽次數(shù):419
摘要:Plastic factory dedicated central feeding system Is designed for the injection molding plant plastic products, to achieve a continuous uninterrupted continuous delivery. Continued forming operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve coloring process Of automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the
Plastic factory dedicated central feeding system
Is designed for the injection molding plant plastic products, to achieve a continuous uninterrupted continuous delivery.

Continued forming operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve coloring process
Of automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the occurrence of congestion in the storage bin, and to achieve full automation by setting the central control station.
 Plastic factory dedicated centralized supply of a machine with a tube, sealed circuit design, to ensure the stability of the entire system, no plastic resurgence, blocking material phenomenon occurred. It is used in conjunction with a central dryer system to allow dry air to dry the raw material again, to prevent the resurfacing of the plastic after drying, and to clean the duct after each conveyance cycle to ensure that there is no residue in the pipe. In order to avoid the return of raw materials at the same time also ensure that the injection molding machine in the consistency of raw materials in the vacuum negative pressure with the role of the original raw materials in the dust filter system filter out, favorable to improve product quality.
 Plastic factory dedicated central feeding system using computer centralized automatic control, to achieve the pellet 24 hours continuous feeding operations. More than a small computer to control the molding machine of each molding process, accurate measurement, mixed evenly, and flexible to change the color, to adapt to the multi-color products and more requirements. According to the production of different molding machine, the flexibility to change the amount of feed. Multiple feed pipe design, can guarantee the requirements of the diversification of the main material. The system has a variety of monitoring and protection functions, safe and reliable work. Plastic factory dedicated central feeding system alias: centralized feeding system, automatic feeding system.

D & A company design plastic factory dedicated central feeding system for automatic injection extrusion special equipment
Using a "one machine a tube" design, to ensure that the entire system of air to transport raw materials to prevent dehumidification after drying raw materials resurgence. At the same time in each transport line is stable, no blocking material phenomenon occurred. It is used with the central dehumidification drying system,

You can use the dehumidification drying cycle will be sent to clean the pipeline to ensure that there is no residual pellet in the pipeline,

In order to avoid the return of raw materials at the same time, but also to ensure that the injection molding machine to join the performance of raw materials consistent. In the vacuum under the action of raw materials in the original dust will be filtered through the dust filter system, help to improve the quality of molding products.

Plastic factory dedicated central feeding system has the following characteristics:

Efficient automatic injection molding Central feeding system can be achieved by a variety of raw materials automatically supply to the multi-chamber arbitrary injection molding equipment used, which may include raw materials, drying, color processing,

As well as the proportion of the use of crushed recycled materials, to carry out a high degree of automation control, monitoring, etc., and to meet the 24-hour non-stop production needs.
 
Plastic factory dedicated central feeding system energy-saving operation is simple, only a few people can control the entire injection molding plant demand for the plant, thereby reducing the large number of labor costs. Second, the reduction in the injection molding machine next to the raw material and the corresponding auxiliary equipment, improve the utilization of space.

In addition, due to the use of the central way of supply, corresponding to reduce a lot of stand-alone equipment, also saves energy and reduce maintenance costs.
Personalized plastic factory dedicated central feeding system can be used to different users, different workshop characteristics, different requirements for the use of raw materials. Can be designed according to the actual needs of the optimal solution.


Plastic factory dedicated central feeding system modern factory image: the raw materials and dust will be on the injection molding production to minimize the level of pollution, which can maintain a clean production workshop, and the Aet Thai plastic factory dedicated centralized feeding system

Unique concentration of dust recovery system, clean more convenient, environmental protection effect is to reach 100,000 clean room operating requirements standards, and reduce noise, and ultimately can achieve unmanned automated production workshop, and establish a modern factory management image.
Plastic factory dedicated central feeding system to improve services: D & A company within the highly efficient and highly skilled construction team to ensure that the construction schedule and the overall project and the original injection workshop
1, from the plant planning, hydropower engineering design, clean room engineering design, technical advice, to the whole plant process planning, by the

People to provide you with the most complete and most professional design and planning.
2. To provide you with the highest quality, high value of the product. Our products are readily available, from dehumidification dryer to automatic metering mixer, hopper dryer, automatic vacuum filling machine, freezer, everything. Quality is definitely worth your trust.
3. By professional engineers for your construction, installation, to complete the test after the delivery, a series of professional services, and provide the necessary education and training and technical guidance.
4. Perfect after-sales service, engineers personally to the factory maintenance, so you completely worry-free. Operating status LED display panel: according to the machine display design, understand the location of the machine, whether it is monitoring



  Plastic factory dedicated central feeding system using computer centralized automatic control, to achieve the pellet 24 hours continuous feeding operations. More than a small computer to control the molding machine of each molding process, accurate measurement, mixed evenly, and flexible to change the color, to adapt to the multi-color products and more requirements. According to the production of different molding machine, the flexibility to change the amount of feed. Multiple feed pipe design, can guarantee the requirements of the diversification of the main material. The system has a variety of monitoring and protection functions, safe and reliable work.

 Plastic factory dedicated central feed for the injection molding plant is the design of plastic products, to achieve a continuous unmanned continuous molding operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve the color process automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the occurrence of congestion in the storage bin, and to achieve full automation by setting the central control station.

(Feeding system, central feeding system, large dehumidification system, color mixing system, spices, automatic unpacking station)
Above is the introduction of the central feeding system, welcomed the new and old customers to customize the plastic factory dedicated central feeding

粵公網(wǎng)安備 44190002002288號

中文日韩v日本国产 | 亚洲AV无码乱码国产精品桃色 | 性色av浪潮av| 黄色污网站在线观看 | 国产精品久久久久久久久爆乳小说 | 日本A级片在线观看 | 精品秘 一区二三区免费雷安 | 又粗又大又黄A片免费看久久久 | 无码人妻久久一区二区三区蜜桃 | 91精品国产一区二区三竹菊影视 | 人妻无码一区二区三区免费n狂飙 | 成人无码www免费视频网站软件 | 久久综合精品国产二区无码不卡 | 男女做受A片AAAA过程 | 男人天堂亚洲天堂 | 强伦轩一级A片在线观看 | 中文字幕无码人妻少妇免费视频 | 特级肥婆BBBBBBBBB视频 | 免费播放婬乱男女婬视频国产 | 91精品无码少妇久久久久久久久 | 东北妇女搡BBBB搡BBBB | 日本A片无码少妇下载免费看直播 | 北京熟妇搡BBBB搡BBBB | 不卡不卡无线一区 | 四川BBB搡BBB爽爽爽欧美 | 成人3D动漫一区二区三下载 | 囯产精品久久久久久久久久辛辛 | 一级a性色生活片久久无 | 免费看黃色AAAA片软件 | 97人妻一区二区三区免费 | 国产伦精品一区二区三毛 | 一级免费黄色视频 | 精品欧美二区三区久久久 | 西西444WWW无码视频男男 | 仙踪林一级婬片A片 | 91精品无码少妇a久久欧美 | 十八禁免费在线观看 | 无码人妻一区二区三区免费京洛会 | 99精品丰满人妻无码一区二区 | 偷拍盗摄ThePorn | 国产精品激情偷乱一区二区∴ |