江苏少妇性BBB搡BBB爽爽爽,日本高清不卡二区三区,成年人免费在线观看视频网站,亚洲精品无码永久中文字幕

產(chǎn)品中心
PRODUCT CENTER

  • 聯(lián)系人 : 曹鏡森先生
  • 聯(lián)系電話 : 0769-82226193
  • 傳真 : 0769-82226193
  • 移動電話 : 15989458768
  • 地址 : ** 廣東省東莞市大朗鎮(zhèn)仙村仙一區(qū)99號
  • Email : caojingshen@126.com
  • 郵編 : 523792
  • 公司網(wǎng)址 : http://vfvalidation-europe.com
  • MSN : caoshingcer@126.com
  • QQ : 454992321
  • 聯(lián)系人 : 曹鏡森
  • 聯(lián)系電話 : 0769-82226193
  • 傳真 : 0769-82226193
  • 公司網(wǎng)址 : http://vfvalidation-europe.com/
文章詳情

Plastic factory dedicated central feeding system

日期:2025-04-03 05:21
瀏覽次數(shù):419
摘要:Plastic factory dedicated central feeding system Is designed for the injection molding plant plastic products, to achieve a continuous uninterrupted continuous delivery. Continued forming operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve coloring process Of automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the
Plastic factory dedicated central feeding system
Is designed for the injection molding plant plastic products, to achieve a continuous uninterrupted continuous delivery.

Continued forming operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve coloring process
Of automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the occurrence of congestion in the storage bin, and to achieve full automation by setting the central control station.
 Plastic factory dedicated centralized supply of a machine with a tube, sealed circuit design, to ensure the stability of the entire system, no plastic resurgence, blocking material phenomenon occurred. It is used in conjunction with a central dryer system to allow dry air to dry the raw material again, to prevent the resurfacing of the plastic after drying, and to clean the duct after each conveyance cycle to ensure that there is no residue in the pipe. In order to avoid the return of raw materials at the same time also ensure that the injection molding machine in the consistency of raw materials in the vacuum negative pressure with the role of the original raw materials in the dust filter system filter out, favorable to improve product quality.
 Plastic factory dedicated central feeding system using computer centralized automatic control, to achieve the pellet 24 hours continuous feeding operations. More than a small computer to control the molding machine of each molding process, accurate measurement, mixed evenly, and flexible to change the color, to adapt to the multi-color products and more requirements. According to the production of different molding machine, the flexibility to change the amount of feed. Multiple feed pipe design, can guarantee the requirements of the diversification of the main material. The system has a variety of monitoring and protection functions, safe and reliable work. Plastic factory dedicated central feeding system alias: centralized feeding system, automatic feeding system.

D & A company design plastic factory dedicated central feeding system for automatic injection extrusion special equipment
Using a "one machine a tube" design, to ensure that the entire system of air to transport raw materials to prevent dehumidification after drying raw materials resurgence. At the same time in each transport line is stable, no blocking material phenomenon occurred. It is used with the central dehumidification drying system,

You can use the dehumidification drying cycle will be sent to clean the pipeline to ensure that there is no residual pellet in the pipeline,

In order to avoid the return of raw materials at the same time, but also to ensure that the injection molding machine to join the performance of raw materials consistent. In the vacuum under the action of raw materials in the original dust will be filtered through the dust filter system, help to improve the quality of molding products.

Plastic factory dedicated central feeding system has the following characteristics:

Efficient automatic injection molding Central feeding system can be achieved by a variety of raw materials automatically supply to the multi-chamber arbitrary injection molding equipment used, which may include raw materials, drying, color processing,

As well as the proportion of the use of crushed recycled materials, to carry out a high degree of automation control, monitoring, etc., and to meet the 24-hour non-stop production needs.
 
Plastic factory dedicated central feeding system energy-saving operation is simple, only a few people can control the entire injection molding plant demand for the plant, thereby reducing the large number of labor costs. Second, the reduction in the injection molding machine next to the raw material and the corresponding auxiliary equipment, improve the utilization of space.

In addition, due to the use of the central way of supply, corresponding to reduce a lot of stand-alone equipment, also saves energy and reduce maintenance costs.
Personalized plastic factory dedicated central feeding system can be used to different users, different workshop characteristics, different requirements for the use of raw materials. Can be designed according to the actual needs of the optimal solution.


Plastic factory dedicated central feeding system modern factory image: the raw materials and dust will be on the injection molding production to minimize the level of pollution, which can maintain a clean production workshop, and the Aet Thai plastic factory dedicated centralized feeding system

Unique concentration of dust recovery system, clean more convenient, environmental protection effect is to reach 100,000 clean room operating requirements standards, and reduce noise, and ultimately can achieve unmanned automated production workshop, and establish a modern factory management image.
Plastic factory dedicated central feeding system to improve services: D & A company within the highly efficient and highly skilled construction team to ensure that the construction schedule and the overall project and the original injection workshop
1, from the plant planning, hydropower engineering design, clean room engineering design, technical advice, to the whole plant process planning, by the

People to provide you with the most complete and most professional design and planning.
2. To provide you with the highest quality, high value of the product. Our products are readily available, from dehumidification dryer to automatic metering mixer, hopper dryer, automatic vacuum filling machine, freezer, everything. Quality is definitely worth your trust.
3. By professional engineers for your construction, installation, to complete the test after the delivery, a series of professional services, and provide the necessary education and training and technical guidance.
4. Perfect after-sales service, engineers personally to the factory maintenance, so you completely worry-free. Operating status LED display panel: according to the machine display design, understand the location of the machine, whether it is monitoring



  Plastic factory dedicated central feeding system using computer centralized automatic control, to achieve the pellet 24 hours continuous feeding operations. More than a small computer to control the molding machine of each molding process, accurate measurement, mixed evenly, and flexible to change the color, to adapt to the multi-color products and more requirements. According to the production of different molding machine, the flexibility to change the amount of feed. Multiple feed pipe design, can guarantee the requirements of the diversification of the main material. The system has a variety of monitoring and protection functions, safe and reliable work.

 Plastic factory dedicated central feed for the injection molding plant is the design of plastic products, to achieve a continuous unmanned continuous molding operations. According to the need to change the variety of raw materials, multi-color materials, the combination of use, to achieve the color process automation. The system is able to regenerate and use the sprinkler in a fully automatic manner, to control all the feeding equipment and to prevent the occurrence of congestion in the storage bin, and to achieve full automation by setting the central control station.

(Feeding system, central feeding system, large dehumidification system, color mixing system, spices, automatic unpacking station)
Above is the introduction of the central feeding system, welcomed the new and old customers to customize the plastic factory dedicated central feeding

粵公網(wǎng)安備 44190002002288號

亚洲乱码国产乱码精品一区二区 | 91精品人妻人人做人碰人人爽 | 国产黄色视频网站 | 欧美黑人XXXⅩ高潮交 | 精品无人区无码乱码国产96 | 日韩精品中文字幕一区二区三区 | 中文字幕狠狠色精品少妇一二区 | 欧美成人免费在线观看 | 亚洲AV午夜精品无码一区 | 少妇又黑又粗又大无码A片直播 | 无码人妻精品一区二区木瓜电影 | 三上悠亚一区二区三区 | 波多野结衣无码视频 | 一级特黄大片在线观看 | 樱桃成人精品视频在线播放 | 久久久久久无码精品无码国产人妻丝瓜 | 国产精品乱码一区二区免费视频 | 日韩精品在线免费视频 | 69精品人人人人人人人人人 | 韩国极品少妇XXXXⅩ视频 | 四川妇女搡BBBB揉BBBB搡_ | 午夜视频在线免费观看 | 黄色在线观看视频 | 好屌淫这里只有精品 | 精品无码一区二区三区爱欲88 | 出轨熟女人妻HD中文 | 肥婆特级大黄A片在线观看 中文字幕一区二区三区红豆 | 特级丰满少妇一级AAAA爱毛片 | 日韩欧美在线观看 | 亚洲AV无码久久蜜桃杨思敏 | WWW,Com,黄色二 | 西西4444WWW无码视频 | 国产成人免费视频 | 嫩草嫩草嫩草嫩草 | 日本一级婬片A片AAA免费 | 8x8ⅹ成人免费视频在线 | 美女自慰喷水网站 | 国产欧美日韩一区二区三区 | 亚洲精品久久久无码 | 久久精品国产亚洲AV成人周妍希 | 亚洲日韩精品秘 在线观看 四川美人搡BBw搡BBw |